Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /data04/c2269140/public_html/wp-includes/functions.php on line 6131
adminbaz, Author at Solar Wheel - Page 3 of 3 Skip to main content

Call us today on +44 (0) 1267 202 388
or email

Met Masts and Data Logging For Wind Energy since 1990

Banner image at the top of the page

South Africa Met Mast Supervision

Alec Church has recently returned from a supervision trip to South Africa.  He was asked to assist Mulilo Renewables with the installation of one 70m HiMast produced by Nexgen, in the fruit growing region of the western cape near a town called Worcester, 2 hours drive North of Cape Town.  He taught a crew of […]

Rhyl Flats Off Shore Windfarm

The off shore climbing team from Solar Wheel Limited have successfully completed the replacement of wind measuring equipment and data loggers on  Rhyl Flats Met mast which was recently extended from 80 to 90 meters in preparation for wind power-performance assessment, part of ongoing works by Npower Renewables to complete and comission the wind farm […]

Local Press Coverage

Plans to develop a four-turbine wind farm near Milford Haven are a step closer with the installation of a temporary mast next week which will measure wind speeds at the proposed site. The 50m anemometer (“met”) mast will be constructed at Wear Point on an industrial site adjacent to the Semlogistics tank storage facility, where […]