Skip to main content

Call or email us today on +44 (0) 1267 202 388

Met Masts and Data Logging For Wind Energy since 1990

Banner image at the top of the page

90 Meter Nexgen H1 installations go ahead

After two and a half years of successfully installing the 80 Meter Nexgen H1 Met Mast were pleased to announce that we are installing the newly developed 90 Meter H1 Met Mast.

Having completed a series of test lifts in collaboration with Nexgen development team, we’re now poised to complete our first commercial installation ‘in the wild’ in the coming weeks.

From Nexgens Website:

Our H1-Mast class has redefined wind monitoring technology, combining groundbreaking engineering and design whilst still proving easy to assemble on site.

All masts in the H1-Mast series are specifically designed for remote locations and have been extensively tested for high wind conditions of up to 150mph. The H1-Mast’s lightweight components make it possible to transport in easy to carry sections, without the need for heavy vehicles.”